Working Hours: 8.00am - 6.00pm
Lusail Stadium is the largest stadium in the Middle East and the arena of the grand final of the 2022 World Cup. The 80,000-seat facility was built on the outskirts of the country's capital (15 km north of the center of Doha) in the futuristic Lusail, a city under construction designated for over 200,000 inhabitants.Client: HBK Contracting Company W.L.L.
Peer Review for the complete Structural Design
Structural Design and Analysis for all Structural Secondary Elements
Preparation of Constructability Analysis with the Supporting Calculations and Drawings and Supporting the Site Team with necessary Calculation required during Construction (i.e. Formwork, Tower Cranes, Platforms, etc.)
Pipe Stress Analysis for Chilled Water Piping Network, Irrigation and Ductile Water Piping network